About usAssetsInvestor RelationsContactsGas Industry
Photo gallery

 2006-2008 <-                                                2009-2010:                                

Karpensky Deep

 G#1

 
Drilling rig, G#1Drilling rig, G#1Drilling rig, G#1 

Drilling rig at G#1

LEWCO-450ton

Mike Calvey, Stephen Ogden,
Ronald Freemen, Tony Alves
with the drilling crew

   
   

Karpensky shallow

Uzensky field

 

Uzen production

Uzen productionUzen production

 Uzen

oil treatment and storage

facilities

 

 

 
   

Uzen production

Uzen production

Uzen production

M. Ivanov with petrol
produced from Uzenskaya oil

3rd party local refinery - 
a buyer of Uzen oil

V. Koshcheev with diesel
produced from Uzenskaya oil

 

 

 

    

Vostochno-Makarovskoye

 

 

GPU

GPUGPU

Gas and condensate

Processing Unit (GPU) at

Dobrinsky field

GPU

GPU

GPU
  

 Ronald Freeman at the GPU

 

 

 

 

 

 

Board Field Trip

   

Board field visit

Board field visit

Board field trip

 

 Aleksei Kalinin and Mike Calvey

     Tony Alves

Board field visitBoard field visitBoard field visit
 

 Mikhail Ivanov and
Vyacheslav Lepilin

     Stephen Ogden

 

 

 

 Saratov governor, Pavel Ipatov

 field visit

 

Ipatov field visit

Ipatov field visit 

Ipatov field visit

at Uzen

at G#1 drilling site

at the drilling rig