About usAssetsInvestor RelationsContactsGas Industry
Photo gallery

 2006-2008 <-                                                2009-2011:                                

Karpensky Deep

 G#1

 5378 meters

Drilling rig, G#1

Drilling rig, G#1

Drilling rig, G#1 

Michael Chesnakov (PM),
Yuri Markhinin (Chief Geologyst)

Drilling rig at G#1

Mike Calvey, Stephen Ogden,
Ronald Freemen, Tony Alves
with the drilling crew

Drilling rig, G#1

Drilling rig, G#1Drilling rig, G#1

Drilling (LEWCO450)

 Casing

 Testing

 

 

 

 

 

 

Karpensky shallow  

Uzensky field

 

Uzen production

Uzen production

 Uzen production

 Uzen     

 oil treatment and storage

 facilities

Uzen production

Uzen production

Uzen production

M. Ivanov with petrol
produced from Uzenskaya oil

3rd party local refinery - 
a buyer of Uzen oil

V. Koshcheev with diesel
produced from Uzenskaya oil

 

 

 

    

Vostochno-Makarovskoye

 

 

GPU

GPUGPU

Gas and condensate

Processing Unit (GPU) at

Dobrinsky field

GPU

GPU

GPU
  

 Ronald Freeman at the GPU

VM testing

VM testing

 Operators at VM

VM testing pad

Test separator

Operators

    

 

 

 

Board Field Trip

 

    

Board field visit

Board field visit

Board field trip

 

Aleksei Kalinin and Mike Calvey

 Tony Alves

Board field visit

Board field visit

 Board field visit

 

 Mikhail Ivanov and
Vyacheslav Lepilin

 Stephen Ogden

 

 

 

Saratov governor, Pavel Ipatovfield visit

 

Ipatov field visit

 Ipatov field visitIpatov field visit

at Uzen

           at G#1 drilling site           at the drilling rig